Home ProductsButt Weld Fittings

Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld

Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld

  • Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld
  • Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld
  • Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld
Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld
Product Details:
Place of Origin: Hebei,China
Brand Name: RT
Certification: CE,ISO,BV,SGS
Model Number: Pipe Fittings
Payment & Shipping Terms:
Minimum Order Quantity: 2000 pieces
Price: To be Negotiable
Packaging Details: By Wooden Case or Pallets or as customer's request
Delivery Time: 35 working days
Payment Terms: T/T, L/C
Supply Ability: 20000pieces/per month
Contact Now
Detailed Product Description
Type: Carbon Steel Pipe Fittings Standard: ASME/ANSI B16.9 B16.48 B16.25
Size: DN10-DN1200 Thickness: SCH10-SCHXXS
Material: A234WPB Surface: Black Paint,Sandblast,oiled
Cert: ISO9001,ISO14001,ISO45001 Usage: Construction Industry,Chemical Industry,Petroleum Field,Nuclear Energy
High Light:

ANSI B16.48 Carbon Steel Weld Pipe Fittings

,

2D Carbon Steel Weld Pipe Fittings

,

ASTM Sch 40 Steel Pipe Fittings

ASTM Forged Butt Welding Carbon Steel Pipe Fitting schedule 80 schedule 40

 

Description:

 

Carbon Steel Pipe Fitting 90 Degree Elbow 45 Degree Elbow A234/A420 Wpi B16.9, is widely used in kinds of industry and building areas all over the world.It can be used for shipbuliding,petroleum,chemical,gas,power,construction,etc.

In the pipeline system, the pipe elbow is a pipe fitting that changes the direction of the pipeline. According to the angle, there are three most commonly used ones: 45°, 90°, and 180°. In addition, according to engineering needs, it also includes other abnormal angle elbows such as 60°.
Size: 1/2"-36" can be seamless, 5"-110" can be welded;
Surface: Black painting or color painting for carbon steel and alloy steel fittings

 

Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 0Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 1

Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 2

Specifications:

 

ASTM Forged Butt Welding Carbon Steel Pipe Fitting schedule 80 schedule 40

Standards

ASME/ANSI B16.9, ASME/ANSI B16.11, ASME/ANSI B16.28,JIS B2311, JIS B2312, DIN 2605, DIN 2615, DIN 2616, DIN 2617, BS 4504, GOST 17375, GOST 30753, GOST 17378

Bending radius

Short Radius(SR), Long Radius(LR), 2D, 3D, 5D

Degree

45 / 90 / 180, or customized degree

Size Range

Seamless type: ½" up to 28"

Welded type: 28"-to 72"

WT Schedule

SCH STD,SCH10 to SCH160, XS, XXS,

Carbon Steel

A234 WPB, WPC; A106B, ASTM A420 WPL9, WPL3, WPL6, WPHY-42WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70,

Alloy Steel

A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91

Applications

Petroleum industry, chemical, power plant, gas piping, shipbuilding. construction, sewage disposal,and nuclear power etc.

Packaging material

plywood cases or pallets, or as per customer's requirements

Production Period

35 working days for normal orders

 

Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 3Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 4Sch 80 Sch 40 Carbon Steel Weld Pipe Fittings ANSI B16.48 2D ASTM Forged Butt Weld 5

 

 FAQ:

 

 1.)Are you a trading company or Factory?

 We are a real factory with our own producing machine and warehouse,started to do business from year 1993

 2.)How long time of your longer cooperation customer?

 Many customers have long cooperation with us,such as European customer cooperated with us 15years.and more.

 3.)What is your advantage?

 Best quality,low price,special service,each customer information record.


 4.)What about your delivery time?

 quantity less than 500tons,25days after get deposit,above 500tons will need 30-35 working days.


 

Contact Details
cangzhou ritai pipe fittings manufacture co., ltd.

Contact Person: Rachael

Tel: 86-532 85761028

Send your inquiry directly to us
Other Products